Session 12 Online PLUMBERS Continuing Education
State Board of Examiners of Plumbers and Gasfitters APPROVED 6 Hour Course for PLUMBERS
Message From The Director
Session 12 For Plumbers
How To Use This Course
Copyright
Learning Objectives - Section 1 Gasfitting
GAS-2A | Board Updates: e-Licensing
GAS-3A | Board Updates: e-Licensing, continued
GAS-3B | Board Updates: e-Licensing
GAS-4A | Board of Examiners: Record Number Letter
Progress Check: e-Licensing & Record Number Letter
GAS-5A | Proposed Gas Code Changes
GAS-5B | Proposed Gas Code Changes
GAS-6A | Proposed Gas Code Changes, continued
Progress Check: Proposed Gas Code Changes
GAS-7A | Merrimack Valley Gas Incident
GAS-8A | Merrimack Valley Gas Incident, continued
GAS-8B | Merrimack Valley Gas Incident, continued
Progress Check: Merrimack Valley Gas Incident
Section 1 GAS Completed
Learning Objectives - Section 2 Gasfitting
GAS-10A | Size of Chimneys
Progress Check: Size of Chimneys
GAS-12A | Inspection of Chimneys
Progress Check: Inspection of Chimneys
GAS-13A | Affidavits: Chimney Examination Requirement
Progress Check: Affidavits: Chimney Examination Requirement
GAS-14A | Chimney Lining
GAS-15A | Chimney Lining, continued
Progress Check: Chimney Lining
GAS-16A | Common Venting Into an Exterior Masonry Chimney
GAS-18A | Common Venting Into an Interior Masonry Chimney, continued
GAS-19A | Chimney Cleanouts
Progress Check: Chimney Cleanouts
GAS-20A | Space Surrounding Lining or Vent
GAS-21A | Draft Water Heater Venting
Progress Check: Chimney Liners & Draft Water Heater Venting
GAS-22A | Engineered Chimney Venting Systems
Section 2 GAS Completed
Learning Objectives - Section 3 Gasfitting
GAS-24A | Sizing Methods: Gas Piping System
Progress Check: Sizing Methods for Gas Piping Systems
GAS-25A | Sizing Methods: Specific Gravity of Gas
Progress Check: Sizing Methods: Specific Gravity of Gas
GAS-26A | Sizing Methods: Comparison
Progress Check: Sizing Methods: Comparison
GAS-27A | Allowable Pressure Drop
GAS-28A | Pressure Drop and Intended Use
GAS-28B | Pressure Drop and Intended Use, continued
Progress Check: Pressure Drop
GAS-30A | Sizing Exercise: Longest Length Method, Table 6.2(b)
GAS-32A | Sizing Exercise: Longest Length Method, Table 6.2(c)
Progress Check: Longest Length Method, Table 6.2(b)
GAS-34A | Sizing Exercise: Branch Method, Table 6.2(b)
GAS-36A | Sizing Exercise: Branch Method, Table 6.2(c)
Progress Check: Branch Method
GAS-38A | Typical EHD to Pipe Size Conversion Table
Progress Check: EHD to Pipe Size Conversion Table
GAS-39A | Exercise: Longest Length Method, Counterstrike®
Progress Check: Longest Length Method, Counterstrike®
Section 3 GAS Completed
Learning Objectives - Section 4 Gasfitting
GAS-44A | Gas Water Heaters in Bedrooms and Bathrooms
Progress Check: Gas Water Heaters in Bedrooms and Bathrooms
GAS-46A | Boilers & Furnaces in Bedrooms and Bathrooms
Progress Check: Boilers & Furnaces in Bedrooms and Bathrooms
GAS-48A | OSHA: Opioid Awareness
Progress Check: OSHA, Opioid Awareness
Section 4 GAS Completed
Learning Objectives: Section 5 Gasfitting
GAS-51A | Welding of Steel and Wrought Iron Pipe
Progress Check: Welding of Steel and Wrought Iron Pipe
GAS-52A | Gas Piping Systems Over 5,000,000 Btu/hr.
Progress Check: Gas Piping Systems Over 5,000,000 Btu/hr.
GAS-53A | Elevated Pressure
GAS-54A | Elevated Pressure, continued
GAS-55A | Elevated Pressure, continued
GAS-56A | Elevated Pressure, continued
Progress Check: Elevated Pressure
GAS-57A | NFPA-58-2011, Liquified Petroleum Gas Code
Progress Check: NFPA-58-2011, Liquified Petroleum Gas Code
GAS-57A | Dual Fuels Installed in Buildings and Structures
GAS-58A | Dual Fuels Installed in Buildings and Structures, continued
Progress Check: Dual Fuels Installed in Buildings and Structures
GAS Section Completed!
Learning Objectives: Section 1 Plumbing
PL-2A | Excessive Water Pressure
Progress Check: Excessive Water Pressure
PL-3A | Metering Devices With Check Valves
Progress Check: Metering Devices With Check Valves
PL-4A | Example: Potable Water Thermal Expansion Tank
PL-5A | Example: Potable Water Thermal Expansion Tank, continued
PL-6A | Example: Potable Water Thermal Expansion Tank, continued
Progress Check: Potable Water Thermal Expansion Tank
PL-7A | Combination Space Heating-Potable Water Systems
PL-8A | Combination Space Heating-Potable Water Systems, continued
PL-9A | Combination Space Heating-Potable Water Systems, continued
PL-10A | Vacuum Breaker Sizing
PL-11A | Vacuum Breaker Sizing, Method 1
PL-11B | Vacuum Breaker Sizing, Method 2
Progress Check: Vacuum Breaker Sizing
PL-12A | Protection of Piping
PL-13A | Protection of Piping, continued
PL-14A | Protection of Piping, continued
Progress Check: Protection of Piping
Section 1 PLUMBING Completed!
Learning Objectives: Section 1 Plumbing
PL-16A | Manufactured Homes/Construction Trailers
PL-17A | Manufactured Homes/Construction Trailers, continued
PL-18A | Manufactured Homes/Construction Trailers, continued
PL-19A | Manufactured Homes/Construction Trailers, continued
Progress Check: Manufactured Homes/Construction Trailers
Section 2 PLUMBING Completed!
Learning Objectives: Section 3 Plumbing
PL-21A | CISPI Handbook: Safe and Durable DWV System
PL-22A | CISPI Handbook: Horizontal Installation Bracing
Progress Check | CISPI Handbook: Horizontal Installation Bracing
PL-23A | CISPI Handbook: Installation of Closet Bends
PL-24A | CISPI Handbook: Testing and Inspection
PL-25A | CISPI Handbook: Testing and Inspection, continued
Progress Check | CISPI Handbook: Testing and Inspection
PL-27A | Water and Peppermint Testing: Cast Iron Piping Systems
Progress Check | Water and Peppermint Testing: Cast Iron Piping Systems
PL-28A | Smoke Testing: Cast Iron Piping Systems
Progress Check | Smoke Testing: Cast Iron Piping Systems
PL-29A | Hubless Cast Iron Soil Pipe and Fittings
Progress Check | Hubless Cast Iron Soil Pipe and Fittings
PL-30A | Sanitary Drainage System: Fixture Units
Progress Check | Sanitary Drainage System: Fixture Units
PL-31A | Sumps and Ejectors
PL-32A | Sumps and Ejectors, continued
PL-33A | Sumps and Ejectors, continued
Progress Check | Sumps and Ejectors
PL-34A | Individual Sink Fixture Pumps
Progress Check | Individual Sink Fixture Pumps
PL-35A | Macerating Pumps
PL-21A | CISPI Handbook: Safe and Durable DWV System
Section 3 PLUMBING Completed!
Learning Objectives: Section 4 Plumbing
PL-37A | 248 CMR 10.02: Basic Principles
Progress Check | 248 CMR 10.02: Basic Principles
PL-38A | Toilet Partitions and Privacy Shields
Progress Check | Toilet Partitions and Privacy Shields
PL-39A | Materials Surrounding Certain Plumbing Fixtures
Progress Check | Materials Surrounding Certain Plumbing Fixtures
PL-40A | Waterproofing of Openings
Progress Check | Waterproofing of Openings
Section 4 PLUMING Completed!
Learning Objectives: Section 5 Plumbing
PL-42A | Proposed Code Changes: Permit Denials
PL-43A | Proposed Code Changes: Hubless Cast Iron Soil Pipe
PL-44A | Proposed Code Changes: Use of Lead
PL-45A | Proposed Code Changes: Use of Lead, continued
PL-46A | Proposed Code Changes: PEX Tubing
PL-47A | Proposed Code Changes: PEX Tubing, continued
PL-48A | Proposed Code Changes: Commercial Use of PVC
PL-49A | Proposed Code Changes: Commercial Use of PVC, continued
PL-50A | Proposed Code Changes: Laundry Drains
Progress Check | Building Drains at the Foundation Wall & Direction of Flow
PL-51A | Proposed Code Changes: Section 11.00
PL-52A | Proposed Code Changes: Section 11.00, continued
PL-53A | Board Updates: New Apprentice Licenses
Session 12 Completed!