Course curriculum

  • 1

    Introduction

    • Message From The Director

    • Session 13 For Plumbers

    • How To Use This Course

    • Copyright

  • 2

    Section 1 GAS

    • Learning Objectives - Section 1 Gasfitting

    • GAS-2A | Contact Information: Board Staff

    • GAS-3A | Using The NFPA-54 Handbook

    • GAS-4A | Using The NFPA-54 Handbook, continued

    • Progress Check: Using The NFPA-54 Handbook

    • GAS-5A | Modifications to NFPA-54: Inspection, Testing and Purging

    • GAS-6A | Modifications to NFPA-54, continued

    • GAS-7A | Testing & Inspection, continued

    • Progress Check: Modifications to NFPA-54

    • GAS-8A | Protective Coatings

    • Progress Check: Protective Coatings

    • Section 1 GAS Completed

  • 3

    Section 2 GAS

    • Learning Objectives - Section 2 Gasfitting

    • GAS-10A | Appliances Installed in Attics

    • GAS-11A | Appliances Installed in Attics, continued

    • Progress Check: Appliances Installed in Attics

    • GAS-12A | Appliances Installed on Roofs

    • GAS-13A | Appliances Installed on Roofs, continued

    • Progress Check: Appliances Installed on Roofs

    • GAS-14A | Access to Appliances on Roofs

    • Progress Check: Access to Appliances on Roofs

    • GAS-15A | Accessibility and Clearance

    • GAS-16A | Accessibility and Clearance, continued

    • Progress Check: Accessibility and Clearance

    • GAS-17A | Gas Appliance Venting: Condensation

    • GAS-18A | Condensate: Manufacturer Instructions

    • Progress Check: Condensation

    • GAS-19A | Sidewall Venting of Gas Appliances

    • GAS-20A | Sidewall Venting of Gas Appliances, continued

    • GAS-21A | Sidewall Venting of Gas Appliances, continued

    • Progress Check: Sidewall Venting of Gas Appliances

    • GAS-22A | Guidance Summary: Gas Meter Clearances

    • Section 2 GAS Completed

  • 4

    Section 3 GAS

    • Learning Objectives - Section 3 Gasfitting

    • GAS-24A | Connecting Appliances and Equipment

    • Progress Check: Connecting Appliances and Equipment

    • GAS-25A | Commercial Cooking Appliances

    • Progress Check: Commercial Cooking Appliances

    • GAS-26A | Suspended Low-Intensity Infrared Tube Heaters

    • Progress Check: Suspended Low-Intensity Infrared Tube Heaters

    • GAS-27 | Use of Nonmetallic Gas Hose Connectors

    • Progress Check: Use of Nonmetallic Gas Hose Connectors

    • GAS-28A | Connection of Portable and Mobile Industrial Appliances

    • Progress Check: Connection of Portable and Mobile Industrial Appliances

    • GAS-29A | Appliance Shutoff Valves and Connections

    • Progress Check: Appliance Shutoff Valves and Connections

    • GAS-30A | Sediment Traps

    • Progress Check: Sediment Traps

    • GAS-31A | Venting Via Damper or a Power Means of Exhaust

    • GAS-32A | Venting Via Damper or a Power Means of Exhaust, continued

    • Progress Check: Venting Via Damper or a Power Means of Exhaust

    • GAS-33A | Gas Valves for Fire Protection/Suppression Systems

    • Section 3 GAS Completed

    • Progress Check: Gas Valves for Fire Protection/Suppression Systems

  • 5

    Section 4 GAS

    • Learning Objectives - Section 4 Gasfitting

    • GAS-35A | Large Gas Equipment: Definitions

    • Progress Check: Large Gas Equipment: Definitions

    • GAS-36A | Large Gas Equipment: Primary Safety Control

    • Progress Check: Large Gas Equipment: Primary Safety Control

    • GAS-37A | Large Gas Equipment: Operating Procedures

    • GAS-38A | Large Gas Equipment: Operating Procedures, continued

    • Progress Check: Large Gas Equipment: Operating Procedures

    • GAS-39A | Large Gas Equipment: Initial Start-Up

    • GAS-40A | Large Gas Equipment: Initial Startup, continued

    • GAS-41A | Large Gas Equipment: Initial Startup, continued

    • Progress Check: Large Gas Equipment: Initial Startup

    • GAS-42A | Fan-Assisted Gas Appliances: Basic Characteristics

    • GAS-43A | Fan-Assisted Gas Appliances: Sizing

    • GAS-44A | Fan-Assisted Gas Appliances: Sizing, continued

    • Progress Check: Fan Assisted Gas Appliances

    • GAS-45A | Fan-Assisted Gas Appliances: Connector Rise

    • Progress Check | Fan Assisted Gas Appliances: Sizing

    • GAS-46A | Fan-Assisted Gas Appliances: Vent Sizing Example

    • GAS-47A | Fan-Assisted Gas Appliances: Vent Sizing Example

    • GAS-48A | Fan-Assisted Gas Appliances: Vent Sizing Example , continued

    • Progress Check | Fan Assisted Gas Appliances: Sizing Examples

    • GAS-49A | Vent Connector Manifolds

    • GAS-50A | Vent Connector Manifolds, continued

    • GAS-51A | Vent Connector Manifolds: Sizing

    • Progress Check | Vent Connector Manifolds

    • Section 4 GAS Completed

  • 6

    Section 5 GAS

    • Learning Objectives: Section 5 Gasfitting

    • GAS-53A | Trench Safety

    • GAS-54A | OSHA Fact Sheet: Trenching & Excavation Safety

    • GAS-56A | Trenching: Access and Egress

    • Progress Check: Trench Safety

    • GAS Section Completed!

  • 7

    Section 1 PLUMBING

    • Learning Objectives: Section 1 Plumbing

    • PL-2A | Hot Water

    • PL-3A | Hot Water, continued

    • PL-4A | Hot Water: Commercial Applications

    • PL-5A | Installation Scenario: Hot Water Temperatures

    • PL-6A | Installation Scenario: Hot Water Temperatures

    • Progress Check: Hot Water: Commercial Applications

    • PL-7A | Disinfection of Potable Water Systems

    • PL-8A | Disinfection of Potable Water Systems, MA DEP

    • PL-9A | Disinfection of Potable Water Systems, EPA

    • Progress Check: Disinfection of Potable Water Systems

    • PL-11A | Prohibited Venting: Combination Waste & Vent System

    • Progress Check: Prohibited Venting: Combination Waste & Vent System

    • PL-12A | Prohibited Venting: Crown Venting Limitation

    • Progress Check: Prohibited Venting: Crown Venting Limitation

    • PL-13A | Prohibited Venting: Extension of Horizontal Drain

    • PL-14A | Prohibited Venting: Below Trap Weir

    • PL-15A | Vent Terminals

    • PL-16A | Vent Terminals, continued

    • Progress Check: Prohibited Venting

    • Section 1 PLUMBING Completed!

  • 8

    Section 2 PLUMBING

    • Learning Objectives: Section 2 Plumbing

    • PL-11A | Prohibited Venting: Combination Waste & Vent System

    • Progress Check: Prohibited Venting: Combination Waste & Vent System

    • PL-12A | Prohibited Venting: Crown Venting Limitation

    • Progress Check: Prohibited Venting: Crown Venting Limitation

    • PL-13A | Prohibited Venting: Extension of Horizontal Drain

    • PL-14A | Prohibited Venting: Below Trap Weir

    • PL-15A | Vent Terminals: Location

    • PL-16A | Vent Terminals, continued

    • Progress Check: Prohibited Venting & Vent Terminals

    • PL-17A | Vent Terminals: Location

    • PL-18A | Vent Extensions Outside of Buildings

    • PL-19A | Wet Venting

    • Progress Check: Vent Terminals & Vent Extensions

    • PL-20A | Wet Venting, continued

    • Progress Check: Wet Venting

    • PL-21A | Common Vents

    • PL-22A | Common Vents

    • PL-23A | Common Vents, continued

    • PL-24A | Common Vents, continued

    • Progress Check: Common Venting

    • Section 2 PLUMBING Completed!

  • 9

    Section 3 PLUMBING

    • Learning Objectives: Section 3 Plumbing

    • PL-26A | Trap Primers

    • Progress Check | Trap Primers

    • PL-27A | Service Sinks

    • PL-28A | Service Sinks, continued

    • Progress Check | Service Sinks

    • PL-29A | Drinking Water Stations

    • PL-30A | Drinking Water Stations: 248 CMR 10.10(18) Table 1, Excerpts

    • Progress Check | Drinking Water Stations

    • PL-31A | Board Advisory: Elevator Sumps

    • Progress Check | Board Advisory: Elevator Sumps

    • PL-32A | Building Height Determination

    • Progress Check | Building Height Determination

    • Progress Check | Sanitary Drainage System: Fixture Units

    • PL-33A | Suds Relief Vents

    • PL-34A | Suds Relief Vents, continued

    • Progress Check | Suds Relief Vents

    • PL-35A | So-Vent Plumbing Systems

    • PL-36A | So-Vent Plumbing Systems, continued

    • Progress Check | So-Vent Plumbing Systems

    • PL-37A | Outdoor Kitchens

    • Section 3 PLUMBING Completed!

  • 10

    Section 4 PLUMBING

    • Learning Objectives: Section 4 Plumbing

    • PL-39A | Demolition and Removal

    • Progress Check | Demolition and Removal

    • PL-40A | Changes in Direction of Drainage Piping

    • Progress Check | Changes in Direction of Drainage Piping

    • PL-41A | Fittings and Connections Prohibited

    • PL-42A | Fittings and Connections Prohibited, continued

    • Progress Check | Fittings and Connections Prohibited

    • PL-43A | Indirect Waste Piping: Swimming Pools

    • Progress Check | Indirect Waste Piping: Swimming Pools

    • PL-44A | Storm Drains

    • PL-45A | Storm Drains, continued

    • Progress Check | Storm Drains

    • PL-46A Board Policy: Secondary Roof Drains

    • PL-47A | Board Policy: Secondary Roof Drains, continued

    • PL-48A | Board Policy: Secondary Roof Drains, continued

    • Progress Check | Secondary Roof Drains

    • Section 4 PLUMBING Completed!

  • 11

    Section 5 PLUMBING

    • Learning Objectives: Section 5 Plumbing

    • PL-50A | Infection Control & Worker Safety: Introduction

    • PL-51A | Micro-organisms

    • Progress Check | Micro-organisms

    • PL-52A | Pathogens

    • PL-53A | Pathogens: Mode of Transmission

    • PL-54A | Pathogens: Mode of Transmission, continued

    • Progress Check | Pathogens

    • PL-55A | Worker Safety: OSHA Training

    • PL-56A | Legionella & Water Temperature

    • PL-57A | Legionella & Water Temperature, continued

    • Progress Check | Legionella

    • PL-58A | Worker Protection: Water Supply

    • PL-59A | Worker Protection: DWV System

    • PL-60A | Worker Protection: DWV System, continued

    • PL-61A | Worker Protection: COVID-19

    • PL-62A | Worker Protection: COVID-19 Transmission

    • PL-63A | Worker Protection: COVID-19 Transmission, continued

    • Progress Check: Worker Protection: DWV System, continued

    • Session 13 Completed!