Session 15 Online PLUMBERS Continuing Education
State Board of Examiners of Plumbers and Gasfitters APPROVED 6 Hour Course for PLUMBERS (not Gasfitters)
Message From The Director
Session 15 For Plumbers
How To Use This Course
Copyright
Learning Objectives - Section 1 Gasfitting
GAS-2A | Contact Information: Board Staff
Progress Check | Contact Information: Board Staff
GAS-3A | Accepted Plumbing Products Online System
GAS-4A | Accepted Products Online System, continued
GAS-5A | Accepted Products Online System, continued
GAS-6A | Accepted Products Online System, continued
GAS-7A | Accepted Products Online System, continued
Progress Check | Accepted Products Online System
GAS-8A | ePLACE Portal: License Management
GAS-9A | ePLACE Portal: License Management, continued
GAS-10A | ePLACE Portal: License Management, continued
GAS-11A | ePLACE Portal: License Management, continued
GAS-12A | ePLACE Portal: License Management, continued
Progress Check: ePLACE Portal: License Management, continued
GAS-13A | ePLACE Portal: Uploading Documents, continued
GAS-14A | ePLACE Portal: Uploading Documents. continued
GAS-15A | ePLACE Portal: Uploading Documents. continued
Progress Check | ePLACE Portal: Uploading Documents
GAS-16A | Inactive Licenses
Progress Check | Inactive Licenses
GAS-17A | Board Guidance: Employing Licensees & Apprentices
Progress Check | Board Guidance: Employing Licensees & Apprentices
GAS-18A | Business License: General Requirements
Progress Check | Business License: General Requirements
GAS-19A | Business License: Corporations
Progress Check | Business License: Corporations
GAS-20A | Example: Articles of Organization (Corporation)
Progress Check | Example: Articles of Organization (Corporation)
GAS-21A | Business License: Limited Liability Companies (LLC’s)
GAS-22A | Example: Certificate of Organization (LLC)
Progress Check | Business License: Limited Liability Companies (LLC’s)
GAS-23A | Business License: Partnerships
Progress Check | Business License: Partnerships
GAS-28A | Unvented Room Heaters
Section 1 GAS Completed
Learning Objectives - Section 2 Gasfitting
GAS-26A | CO Detector Requirements: Residential
Progress Check: CO Detector Requirements: Residential
GAS-27A | Ventilating Hoods & Exhaust Systems
Progress Check: Ventilating Hoods & Exhaust Systems
GAS-28A | Unvented Room Heaters
Progress Check: Unvented Room Heaters
GAS-29A | CO Detector Requirements: Generators
Progress Check: CO Detector Requirements: Generators
GAS-30A | Protection of Piping: CSST
Progress Check | Protection of Piping: CSST
GAS-31A | Protection of Piping: Gastite® Flashshield+™ CSST
GAS-32A | Protection of Piping: Gastite® Flashshield+™ CSST, continued
Progress Check | Protection of Piping: Gastite® Flashshield+™ CSST
GAS-33A | Protection of Piping: Building Code Excerpts
Section 2 GAS Completed
Learning Objectives - Section 3 Gasfitting
GAS-36A | Code Changes: Gas Appliance Venting
Progress Check | Code Changes: Gas Appliance Venting
GAS-37A | Example: IPEX System 636® CPVC
GAS-38A | Example: IPEX System 636® CPVC
Progress Check | Example: IPEX System 636® CPVC
GAS-39A | Example: Centrotherm ECO System, LLC InnoFlue
GAS-40A | Example: Centrotherm ECO System, LLC InnoFlue
Progress Check | Example: Centrotherm ECO System, LLC InnoFlue
GAS-41A | Partial List: Product-Accepted Plastic Vent Materials
GAS-42A | Board Questions: Gas Vent Code Changes
GAS-43A | Board Questions: Gas Vent Code Changes, continued
GAS-44A | Board Questions: Gas Vent Code Changes, continued
GAS-45A | Board Questions: Gas Vent Code Changes, continued
Progress Check | Gas Vent Code Changes
Section 3 GAS Completed
Learning Objectives - Section 4 Gasfitting
GAS-46A | NFPA-58-2011, LP Gas Code Definitions
GAS-47A | NFPA-58-2011 5.8.1: Regulators & Regulator Vents
GAS-48A | NFPA-58-2011 5.8.1: Regulators & Regulator Vents
GAS-49A | NFPA-58-2011 5.8.1: Regulators & Regulator Vents
GAS-50A | NFPA-58-2011 5.8.3: Pipe for Regulator Venting
GAS-51A | NFPA-58-2011 6.8: Regulators
Progress Check | Regulators & Regulator Vents
GAS-52A | Sizing Methods: Gas Piping System
Progress Check | Sizing Methods: Gas Piping System
GAS-53A | Sizing Methods: Specific Gravity of Gas
Progress Check | Sizing Methods: Specific Gravity of Gas
GAS-54A | Sizing Methods: Comparison
Progress Check | Sizing Methods: Comparison
GAS-55A | Allowable Pressure Drop
Progress Check | Allowable Pressure Drop
GAS-56A | Pressure Drop and Intended Use
Progress Check | Pressure Drop and Intended Use
GAS-58A | Sizing Exercise: Longest Length Method, Table 6.2(b)
GAS-59A | Sizing Exercise: Longest Length Method, Table 6.2(b), continued
GAS-60A | Sizing Exercise: Longest Length Method, Table 6.2(c)
GAS-62A | Sizing Exercise: Branch Method, Table 6.2(b)
GAS-63A | Sizing Exercise: Branch Method, Table 6.2(b), continued
GAS-64A | Sizing Exercise: Branch Method, Table 6.2(c)
GAS-66A | Typical EHD to Pipe Size Conversion Table
GAS-67A | Exercise: Longest Length Method, Counterstrike®
GAS-68A | Exercise: Longest Length Method, Counterstrike®, continued
GAS-69A | Exercise: Longest Length Method, Counterstrike®, continued
Progress Check | Sizing Exercise Tables
GAS-70A | Apollo® PowerPress: Installation Instructions
Progress Check | Apollo® PowerPress: Installation Instructions
Section 4 GAS Completed
Learning Objectives: Section 5 Gasfitting
GAS-74A | Board Policy: Out-Door Gas Fired Patio Equipment
GAS-75A | Dual Fuels Installed in Buildings and Structures
Progress Check | Out-Door Gas Fired Patio Equipment
GAS-76A | Dual Fuels Installed in Buildings and Structures, continued
Progress Check | Dual Fuels Installed in Buildings and Structures
GAS-77A | Gas Piping Systems Over Five Million Btu/hr
Progress Check | Gas Piping Systems Over Five Million Btu/hr
GAS-78A | Gas Pressure Boosters
Progress Check | Gas Pressure Boosters
GAS-79A | Cannabis Growing Facilities: Considerations
GAS-80A | OSHA: Preventing Heat Illness in the Workplace
Progress Check | OSHA: Preventing Heat Illness in the Workplace
GAS Section Completed!
Learning Objectives: Section 1 Plumbing
PL-2A | Cross Connections: General Principals
PL-3A | Cross Connections: General Principals, continued
Progress Check: Cross Connections: General Principals
PL-4A | Cross Connections: DEP Regulations
PL-5A | Cross Connections: DEP Regulations, continued
Progress Check: Cross Connections: DEP Regulations
PL-6A | Cross Connections: Public Water System Responsibilities
Progress Check: Cross Connections: Public Water System Responsibilities
PL-7A | Cross Connections: Plumbing Inspector Responsibilities
PL-8A | Cross Connections: Device Installation and Removal
Progress Check: Cross Connections: Device Installation and Removal
PL-9A | Cross Connections: RPZ Device Installation
PL-10A | Cross Connections: RPZ Device Installation, continued
Progress Check: Cross Connections: RPZ Device Installation
PL-11A | Cross Connections: Vacuum Breakers
Progress Check: Cross Connections: Vacuum Breakers
PL-12A | Cross Connections: 248 CMR Table 8
Progress Check: Cross Connections: 248 CMR Table 8
PL-13A | Cross Connections: 248 CMR Table 8A
PL-14A | Cross Connections: 248 CMR Table 8A, continued
PL-15A | Cross Connections: 248 CMR Table 8A, continued
Progress Check: Cross Connections: 248 CMR Table 8A
Section 1 PLUMBING Completed!
Learning Objectives: Section 2 Plumbing
PL-18A | 248 CMR 3.04(3) Special Permission
Progress Check: Special Permission
PL-19A | Special Permission: Application, Page 1
PL-20A | Special Permission: Application, Page 2
Progress Check: Special Permission: Application
PL-21A | Special Permission: Application General Notes
PL-22A | Special Permission: Water Recycling Systems
Progress Check: Special Permission: Water Recycling Systems
PL-23A | Board Policy: Water Recycling Systems
PL-24A | Board Policy: Water Recycling Systems, continued
PL-25A | Board Policy: Water Recycling Systems, continued
Progress Check: Board Policy: Water Recycling Systems
PL-26A | Special Permission: Combination Waste & Vent System
Progress Check | Special Permission: Combination Waste & Vent System
PL-27A | Special Permission: Air Admittance Valves & Automatic Vents
Progress Check | Special Permission: Air Admittance Valves & Automatic Vents
PL-28A | Board Policy: SO-VENT Plumbing Systems
PL-29A | Board Policy: SO-VENT Plumbing Systems, continued
Progress Check | Board Policy: SO-VENT Plumbing Systems, continued
PL-30A | 248 CMR 3.04(4) Test Sites
PL-31A | Test Site Application
Progress Check | 248 CMR 3.04(4) Test Sites
Section 2 PLUMBING Completed!
Learning Objectives: Section 3 Plumbing
PL-34A | Water Closet Carrier: J.R. Smith Manufacturing
PL-35A | Incorrect Connections: Water Closet Carrier
PL-36A | Water Closet Carrier: Zurn Industries LLC
PL-37A | Piping Configurations: Water Closet Carriers
PL-38A | Piping Configurations: Urinals
Progress Check | Carriers & Piping Configurations
PL-39A | Clear Water Waste
Progress Check: Clear Water Waste
PL-40A | Air Gaps and Air Breaks
PL-41A | Illustration: Storm Drainage System & Indirect Wastes
Section 3 PLUMBING Completed!
Learning Objectives: Section 4 Plumbing
PL-44A | Allowable Materials
Progress Check | Allowable Materials
PL-45A | Viega ProPress System: Applications
Progress Check | Viega ProPress System: Applications
PL-46A | Tub Fillers and Temperature Control
Progress Check | Tub Fillers and Temperature Control
PL-47A | On-Demand Tankless Water Heaters: Interpretation
PL-48A | On-Demand Tankless Water Heaters: Interpretation, continued
Progress Check | On-Demand Tankless Water Heaters: Interpretation
PL-49A | Sizing: Rheem® Performance Platinum
PL-50A | Sizing: Rheem® Performance Platinum, continued
Progress Check | Sizing: Rheem® Performance Platinum
PL-51A | Waterless Toilets & Foam-Flush Toilets
PL-52A | Galvanized Piping
Section 4 PLUMBING Completed!
Learning Objectives: Section 5 Plumbing
PL-54A | Cannabis Grow House Facilities
PL-55A | Cannabis Grow House Facilities, continued
PL-56A | Cannabis Grow House Facilities, Irrigation
PL-57A | Cannabis Grow House Facilities, Miscellaneous
Progress Check | Cannabis Grow House Facilities
Session 15 Completed!